Pelican Narrows Water Treatment Plant

Pelican Narrows I.R. 184B, SK

Size:
$11.6 Million
Delivery Method:
Completed:
2021
Client:
Peter Ballantyne Cree Nation. (Consultant: AECOM)

This project involved expansion of the existing water treatment plant building and renovation to the existing building.  The water treatment equipment and process were completely replaced with new treatment equipment for filtration and organics removal.  A new reinforced concrete water reservoir was constructed beneath and beside the water plant building expansion. All mechanical and electrical systems were replaced within the existing facility.

Features:
Concrete water reservoir, existing system remained operational during winter construction, 16 month schedule